The Home Building Process

Ever wonder how to build a home? Come along with us through the construction of a home that we built for one of Wisconsin's most sought after home builders. B & J Construction Services participated in both the rough and finish carpentry of this beautiful property. Contact us for your next carpentry project or call our carpentry references, trusted home builders in our area. We will exceed your expectations.

  Click on any image below for a larger version. Obtain proper local and community approvals for drainage plans, building plans and landscape plans.
    Apply for building permits.
07-14-07 select-trees-remmavl_small Select and clear trees for the building site,
7-24-07 Adams-Lot-Cleared-10_small Lot is cleared. Trees removed. Stumps ground out.
7-29-07 save-top-soil_small Top soil is scraped and set aside for final landscaping - a Green Built Home Practice
8-3-07 protect-trees-with-fencing_small Preparing the building site according to Green Guidelines. Demarcate limits of clearing and grading. Create construction "no disturbance" zones using fencing or flagging to protect vegetation and sensitive areas from construction vehicles, material storage, and washout.
8-4-07 root-fertilization An arborist is engaged to conduct deep root fertilization to protect trees near the building site. Deep root fertilization is a process where a high quality nutrient solution is injected into the root zone of trees. The materials are injected into the root zone under pressure which helps aerate or provide much needed oxygen to the root system. The soil injection begins just below the surface and goes to a depth of 12 - 4 inches.
8-5-07 protect-trees_small Minimize disturbance of and damage to trees and other vegetation designated for protection through installation of fencing and avoidance of trenching, significant changes in grade, and compaction of soil and critical root zones. Prepare designated existing trees and vegetation for the impacts of construction through pruning, root pruning, fertilizing, and watering. Fence off trees to prevent the weight of building crew trucks from damaging the existing root systems, a Green Built Home Practice
8-5-07 green-soil-erosion-fence_small Install and maintain sediment and erosion controls, a Green Built Home Practice
8-6-07 protect-trees-with-chips_small Reduce soil compaction from construction equipment by laying mulch, chipped wood, or plywood sheets. We use chips from the building's site ground up limbs and stumps to further protect adjacent trees, a Green Built Home Practice
8-9-07 Adams-Beginning-11_small Excavation
8-10-07 Adams-Beginning-09_small Lay gravel base to support construction traffic.
8-10-07 track-pad_small Install track pad. Cut the base in the site of the final driveway - lay with track pad to reduce the tracking of mud onto local street be construction crew vehicles - a "nice neighbor" practice.
8-12-07 footings_small2 Pour footings. Install form-a-drain-system. Form A Drain is a patented, all-in-one, stay in place, system that forms the foundation footing, provides drainage and can be adapted to provide a sub-slab radon reduction system. In addition to providing a superior footing, Form A Drain creates an ideal drainage system, one that is parallel to the footing and below the foundation wall.
8-15-07 Adams-Foundation-Setup-3-8-_small Basement walls set up for pouring.
8-17-07 Adams-Foundation-Setup-4-8-_small Wall set up continues
8-15-07 Adams-Frost-Wall-Walk-Out_small Frost walls installed.
8-15-07 Adams-foundation-setup-1---_small Form A Drain system installed along with foundation.
8-16-07 pour-foundation_small Begin pouring foundation walls. Continuous (stem wall) foundations are  constructed poured concrete, supported by a continuous, reinforced-concrete spread footing.
8-17-07 foundation_small Foundation walls complete.
8-7-07 air-conditioning-support_small Supports for future air conditioning units are installed.
     
8-21-07 insulate_basement-exterior_small Insulate exterior foundation walls.
8-22-07 pour-basement-footings Backfill footings. Although most building codes only require 12", we use from 2 to 3 feet of gravel.
8-22-07 basement-gravel_small Lay gravel for basement floor. Due to the use of supporting grade beams, this floor will be poured earlier than usual in the building schedule.
8-24-07 oleary5_small Trenching basement floor drains to alleviate ground water build up during and after construction, and to protect nearby trees from excess water run off, a Green Built Home Practice
8-24-07 oleary4_small Installation of sewer drain.
8-24-07 exterior-drain-complete_small Sewer drain complete.
8-27-07 rough-pumbing-in-floor_small Install rough plumbing in foundation prior to grade beams.
8-28-07 grade-beam-footings_small I nstall grade beam footings to help support the load of wide flooring spans and to facilitate the installation of heating ductwork later in construction. A grade beam footing is a continuous reinforced-concrete member used to support loads with minimal bending and are capable of spanning across non-load bearing areas.
8-30-07 floor-insulation_small Basement crushed stone was graded and compacted. Then a vapor barrier was placed to cover the entire basement area. 2" Styrofoam was then placed on top to reduce thermal heat loss.
8-31-07 in-floor-tubing_small In-floor heating tubes were installed in preparation for an on-demand hot water system, a Green Built Home Practice
8-31-07 in-floor-heat-setup_small More prep for on demand hot water system.
9-4-07 pour-foundation-floor_small Pouring the basement floor.
9-04-07 Adams-Floor-Poured-and-Soft_small Basement floor poured and soft cut, then sealed the following day.
9-05-07 Stone-backfill_small Foundation is backfilled with stone
9-6-07 backfill-complete_small Foundation backfill complete- delayed due to heavy rains.
9-18-07 Adams-LL-Framing1_small Lower level framed.
9-18-07 Adams-TJI-Capping_small Foundation is capped.
9-20-07 Adams-Main-Floor-Layout_small Main floor layout.
9-2007 Adams-by-Paul3_small Framing
9-2007 Adams-by-Paul4_small Framing
9-2007 Adams-by-Paul8_small Framing
 10-3-07 framing-oct-3_small Framing
10-17-07 framing-10-17_small Framing
10-20-07 framing3-10-20_small Framing
10-20-07 framing2-10-20_small Framing
10-23-07 framing3-10-23_small Framing
10-23-07 framing-10-20_small Framing
10-23-07 framing1-10-23_small Framing
10-23-07 timberstrand-brianna_small TimberStrand was used on all walls over 10'. TimberStrand is an engineered lumber that is always straight, true and consistent. It is free of knots and resists twisting, shrinking and bowing after installation. This helps reduce sheetrock cracks. Cabinets and countertops install flush without the hassles of shimming. Reduces the chance of tile and grout cracking. Framing inspection by Brianna.
11-19-07 11-19-07(2)Adams_small Framing continues. Windows are being installed.
11-20-07 front-stoop-poured_small Front stoop is poured.
11-20-07 garage-pour_small Garage is poured
11-20-07 garage-handicap-access_small Zero-step access garage entrance is completed - a barrier free, universal design principal.
11-22-07 brick-goes-up_small Exterior brick goes up.
11-26-07 chimney-brick_small Chimneys run with brick.
11-26-07 rough-plumbing1_small Rough plumbing begins.
11-27-07 tub-installation_small Bath tubs are installed and protected with wood caps.
11-29-07 Chimney-caps-installed_small Copper Chimney Caps Installed
11-29-07 fireplace-hearthroom_small Fireplaces are installed
12-1-07 brick-on-front-stoop_small Front entrance is laid with brick.
12-10-07 stone-sills_small Stone sills are installed.
12-05--07   Rough electric begins
12-05-07 windows-almost-complete_small Window installation almost complete. Roofing 75% complete
12-14-07 roofing-almost-complete_small Roofing is finished.
12-14-07 grab-bar-bathroom_small Blocking for grab bars - a barrier free universal design principal
12-17-07 siding-starts_small Exterior siding begins. As an extension of the Universal Design Principal, this home is finished with HardiPlank and HardiShingles, offering the longevity and low maintenance of Engineered Cement Composite to reduce future maintenance requirements.
1-19-08 rearelevation-jan-21_small Exterior framing complete. 1 degree below zero!
1-19-08 front-entry-1-19-08_small Front entry nears completion.
1-19-08 cleanup-1-21-2008_small Interior cleaned up and ready for inspections. All systems passed inspection! Dry wall is next.
1-27-08 entrance-complete_small Front entry complete.
1-27-08 front-entrance-ceiling_small Azek beadboard was used to finish off the barrel roll ceiling on the front entry to reduce cracking and warping.
1-28-08 AdamsCeiling-Insul_small Lower level ceilings insulated with R-19.
2-2-08 Adams-Insulation2-2-08_small Exterior walls insulated with R-21.
2-15 insulation-attic_small R-50 Attic insulation complete.
2-22 drywall1_small Drywall installation and taping complete.
  drywall-prep_small Home is prepped for drywall spray.
2-26 skip-trowel_small Drywall textures being applied.
2-27 drywall-finishes-complete_small Drywall wall finishes complete.
3-5-08 flooring-2-3-08_small Walnut flooring installation begun
3-6-08 flooringa-2-3-08_small Walnut flooring installation almost complete
3-7-08 millwork-arrives_small Doors are delivered.
3-7-08 Adams-Millwork-Racked_small Millwork is delivered.
3-11=08 tompa-delivery_small Custom cabinet delivery
3-12-08 cabinet-installation_small Cabinet installation begins
3-12-08 painting-preparation_small Windows are being prepped for staining and painting.
3-19-08 cabinet-installation-contin_small1 Cabinet installation continues.
3-25-08 tile-install-begins_small Tile installation begins.
3-29-08 tile-install-continues_small Tile installation continues.
3-30-08 tile-install-continues2_small Tile installation continues.
4-9-08 stain-colors-created_small Custom stain colors are tested and selected.
4-10-08 doors-interior-lower-level_small Lower level interior doors are hung.
4-11-08 decking-exterior_small Exterior wood decking is installed using hidden fasteners.
4-18-08 beams-great-room-installed_small Great room beam installation begins.
4-19-08 Azek-under-decking_small Maintenance free Azek is installed as under-decking, with screening above to protect against insects in porch above.
4-19-08 tile-install-continues3_small Tile installation continues.
4-22-08 tile-install-continues4_small Tile installation continues.
4-27-08 finish-carpentry-continues_small Finish carpentry continues.
4-27-08 tile-mbr-complete_small Master shower tile installed.
4-28-08 beams-great-room-complete_small Great room beams are completed.
4-29-08 doors-interior-upperr-level_small Upper level doors are installed.
4-29 beams-master-bdrm_small Master bedroom beams are completed.
4-30-08 door-front-installed_small Front doors are installed.
4-30-08 stair-construction-begins_small1 Stair construction begins.
4-30-08 counter-tops-measured_small Counter tops are measured.
5-2-08 flooring-slate-installed_small Upper level slated being installed.
5-2-08 carpentry-finish-inspection_small Finish carpentry inspection by Brianna.
5-2-08 stair-ballusters-set_small Stair balusters are positioned using lasers.
5-3-08 carpentry-crown-molding_small Final crown molding installed.
5-6-08 painters-prep-doors_small Painters prepare for painting the doors.
5-15-08 painters-prep-windows_small Painters prep upper level windows.
5-15-08 flooring-slate-grouted_small Upper level slate is grouted.
5-19-08 beams-great-room-stained_small Great room beams are stained.
5-27-08 tile-master-bath_small Master bath tub surround installed.
5-27-08 painting-continues_small Painting continues.
5-27-08 painting-stainig_small Wood-finishing continues.
5-27-08 tile-master-tub-access_small Master-tub-mechanicals access installed.
6-4-08 fp-hearthroom_small Fireplace stone installation begins in the hearth room.
6-04-08 painters-prep-floors_small Upper floors are covered in preparation for the painters.
6-4-08

 

fp-greatroom_small Great room fireplace is stained, the surround is installed, and covered in preparation for the painters.
6-4-08 beams-master-stained_small Master bedroom beams are stained.
6-4-08 fp-porch-begins_small Preparation for installing the exterior stone fireplace.
6-4-08 tile-mbr-grout_small Master shower grout complete.
6-4-08 tile-mstr-tub-complete_small Master tub surround complete.
6-4-08 fp-stone-complet_small Hearth room stone surround complete.
6-4-08 fp-porch-complete_small Exterior fireplace stone complete.
6-5-08 painters-lower-trimcomplete_small Lower level trim and doors painted.
6-9-08 painting-continues-ll_small Lower level painting continues.
6-10 black-cabinets_small Lower level cabinets painted using General Finishes Enduro Professional Waterbase paint - a Green Practice.
6-18 countertops-continued_small Stone counter tops are installed in great room.
6-18-08 corian-countertopsx_small Corian countertops and seamless sinks are installed in pantry.
6-19-08 solotubes_small Solatubes installed in command center to increase natural lighting, a Green practice.
6-18-08 painting-upperlevel-crown_small Painting of upper level continues.
6-19-08 painting-lower-continues_small Lower level painting continues
6-19 sewer-grinder_small Sewer grinder installed.
6-19-08 sewer-water_small Trenching begins for sewer and water.
6-20-08 sewer-direcrtional-drilling_small Directional drilling of sewer is completed.
6-21-08 exterior-wall-stone_small Stone is delivered for exterior retaining walls.
6-23-08 retaining-walls_small Work begins on exterior retaining walls.
6-24-08 retaining-walls-cont_small Work continues on exterior retaining walls.
6-25-08 painting-lower-complete_small Lower level painting complete
7-2-08 plumbing-final-sinks_small Final plumbing installations begin.
7-2-08 appliance-installation_small Appliance installation begins.
7-5-08 painting-upper-cont_small Painting of upper level continues.
7-9-08 painting-utiltity_small Utility cabinets are painted.
7-9-08 electric-finished_small Finished electric begins.
7-9 ceilings-painted-upper_small Upper level ceilings are painted
7-11-08 cabinets-plumbing_small Finished plumbing installation continues. Cabinets are painted Grasshopper Green using General Finishes water based finishes, a Green Practice.
7-11-08 painting-kit_small Interior painting continues.
7-11-08 porch-screens-installed_small Porch screen installation begins.
7-11-08 elect-finsih-cont_small Finished electric continues.
7-11-08 stairway-complete_small It is time to complete the stairway. The finishing of this area is always done at the end to minimize damage due to to traffic.
7-11-08 porch-cable-railings_small Porch cable tie railings are complete.
7-14-08 exterior-entrance_small Exterior entrance complete
7-16-08 painting-exterior-begins_small Painting final exterior coat begins.
7-16-08 porch-screening-final_small Porch screening almost complete.
7-15-08 gutters-installed_small Gutters installed.
7-16-08 cabinet-doors-installed_small Cabinet doors installed
7-17-08 floors-sanded_small Hardwood floors are sanded.
7-18-08 elect-finsih-conts_small Finished electric continues.
7-18-08 exterior-decks-installed_small Exterior decks installed.
7-23-08 painting-ext-conts_small Painting exterior continues.
7-23-08 pATio-installation_small Patio installation.
7-27-08 elect-finsih-conINUESt_small Finish electric continues.
7-28-08 flooring-finished_small Finish is applied to walnut hardwood flooring.
7-30-08 tile-installation-kitchen_small Tile installed in kitchen backsplash.
7-30-08 electric-panels-complete_small Electric panels complete.
7-30-08 painting-upper-continues_small Painting upper level continues.
8-5-08 construction-supervisor_small Hanging final light fixture.
8-6-08 let-there-be-lght_small And it works!
8-6-08 doors-hung_small The last doors are hung.
8-16-08 central-vac_small Central vac installed
8-16-08 carpeting-lower-level_small Lower level carpeting installed
8-16-08 tankless-hot-water-heaters_small Tankless hot water heaters installed - a Green Practice.
8-24-08 final-gr_small Great room completed.
8-24-08 final-gr3_small Great room completed.
8-24-08 final-kitchen_small Kitchen completed.
8-24-08 final-kit_small Kitchen completed.
8-24-08 fianl-stair_small Stairway completed.
8-24-08 owners_small Ready for homeowner approval.

B and J Carpentry Services serving South Eastern Wisconsin and Northern Illinois with rough carpentry and finished carpentry.